Customization: | Available |
---|---|
Type: | 3D Underground Water Detector |
Usage: | 3D Underground Water Detector |
Still deciding? Get samples of US$ 13538/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model No. | GT150A | GT300A | GT500A | GT1000A | GT1500A | GT2000A | GT3200A |
Optional depth | 150m | 150m 300m |
150m 300m 500m |
500m 800m 1000m |
500m 1000m 1500m |
500m 1000m 1500m 2000m |
500m 1000m 1500m 2000m 3200m |
Measuring time | 5-6min | 6-8min | 8-10min | 10-15min | 15-20min | 20-25min | / |
Maximum number of channels | 18 channels | ||||||
Minimum resolution | 0.001mv | ||||||
Points selection | Points selection 1-18 points optional | ||||||
Controller | 32-bit high-speed CPU | ||||||
A/D conversion | 16 bits 1Msps | ||||||
Working temperatureture | -20ºC~50ºC | ||||||
Power consumption | 9W | ||||||
Measurement data unit | Electric field components of different frequencies of magnetotelluric field Vs (mV) | ||||||
Display screen unit | 10.1 inch industrial-level high-definition display (resolution 1024*600) | ||||||
Standby time | 8h | ||||||
Cable | 2.5m point pitch, 10m line pitch, 54.7m in total length | ||||||
Electrode | Each comes standard with 22 pieces | ||||||
Host weight | 1.95kg |
Packing |
one set in flight case and strong carton |
size (LxWxH):46x19x41cm,52x22x31cm | |
G.W: 20KG | |
Shipment terms | Shipping way: DHL/ FEDEX / TNT/UPS/EMS |
Delivery time: 1-2days after receipt of payment | |
Shipping time: 5 working days express. 5-7 working days by air. 23-25 working days by sea |
|
Payment methods | T/T ,Western Union, PayPal , ESCROW |
Payment terms | sample order: 100% payment before production bulk order: prepay 30-50% deposit before production, the balance should be paid before shipment |